Thailand’s floods make climate resilience a priority for EV charging
Kempower calls on charging operators, property owners and investors to build dependable access and safe recovery into Thailand’s expanding EV charging network.
Floodwater does not have to reach an electric vehicle to interrupt its next journey. A power cut at home, a closed parking area or an inaccessible charging station can leave a driver searching for somewhere else to charge. Thailand’s recent floods bring that vulnerability into focus as more households and businesses switch to EVs.
In a recent update, the Provincial Electricity Authority described suspending power at specific locations at risk of flooding, raising vulnerable equipment and restoring supply after water levels recede and safety checks are completed. For EV users, these necessary precautions underline how charging access can depend on conditions beyond the vehicle itself.
The stakes are growing. According to the Federation of Thai Industries, Thailand had more than 415,000 registered battery-electric passenger cars by the end of August 2026. As that population expands, dependable charging becomes an everyday transport requirement, connecting investment in infrastructure with drivers’ confidence in the EV transition.
Kempower is calling on charging operators, property owners and investors to make climate exposure, available power and service recovery part of the investment decision. The objective is practical: help drivers find usable charging when their normal arrangements change.
For a driver, the value of a charging network becomes clear when their usual option is unavailable. Resilience means having a usable alternative, reliable information and a plan to restore service safely.” Carlo Cecchi, Director of New Markets, Kempower.
The cost of losing access to charging
For a household, losing access to home or condominium charging can complicate the next school run or commute. For a taxi or ride-hailing driver, additional time spent finding a charger can reduce earning time. Commercial fleets face the same underlying dependency, with delivery schedules and passenger services tied to charging availability.
These disruptions also affect the businesses investing in charging. An inaccessible station cannot serve customers, while a nearby operational site may face additional demand. At shopping centers, hotels and workplaces, the charging service forms part of the wider experience that property owners offer visitors and tenants.
Planning therefore needs to account for how demand could shift during disruption. If home charging becomes unavailable in one neighborhood, which public sites could drivers realistically use? Would those sites have sufficient power and capacity at the times people need them?
Location matters as much as the number of charging points. Several stations exposed to the same flooding, road closure or electricity interruption may offer limited alternatives. Assessing coverage across different locations and access routes can reveal gaps that a simple count of chargers would miss.
Making available power work harder
At an operational charging site, a sudden increase in demand can put pressure on the electricity connection. Chargers at a retail property or hotel may share capacity with air conditioning, lighting and other building services. The charging design needs to account for these loads and the power actually available.
Kempower’s ChargEye EV charging management software supports public charging operations through remote monitoring, event notifications and power management within configured limits. With the Kempower Load Manager Kit, charging power can also be adjusted in response to other electrical loads at the facility, helping operators work within the site’s available capacity.
Dynamic power distribution allocates available charging power among connected vehicles as their requirements change. This can help operators use capacity more effectively, but the amount of energy delivered still depends on the electricity supply and the time vehicles remain connected. A higher charger rating alone cannot resolve a constrained connection.
“A charging investment needs to work with the power available at the site and the conditions around it. The technology, site design and operating plan need to be considered together,” Cecchi said.
A contingency plan must extend beyond the charging site
Flood exposure, drainage, equipment positioning and access roads all belong in site assessments with qualified specialists. Operators also need clear responsibility for stopping charging when conditions become unsafe, inspecting affected equipment and authorizing its return to service.
Drivers need accurate information about closures and alternatives. A charger shown as operational may still be unreachable because of a flooded road, making local checks and timely updates essential. Any alternative site must be accessible and compatible with the vehicles expected to use it.
Where operators consider energy storage or on-site generation, the design needs to match the intended charging demand and outage duration, with appropriate electrical protection. Charging software can help manage available power; backup electricity requires a separately engineered system.
A local model for flexible charging
Thailand already has examples of charging designed to serve multiple drivers with shared power. Mangmee EV opened its first station using Kempower technology in May 2025 at Bangchak Thap Ma on Highway 36 in Rayong, a location serving travel between Bangkok and the eastern region.
The station combines a 300 kW Kempower Power Unit with three Kempower double-output Satellites. Kempower’s distributed charging system with dynamic power distribution shares the available capacity among connected vehicles according to their charging needs. The arrangement illustrates how one power system can support several users as demand changes.
That flexibility is one part of the investment equation. Site-specific assessment of flood exposure, electricity supply and road access is also needed to determine how a location can serve drivers during disruption and how it can recover safely afterward.
For Thailand’s next charging investments, these decisions bring property owners, charging operators, utilities and engineering teams into the same discussion. Alongside equipment specifications and expected utilization, the investment case should establish who manages closures, how customers receive updates and what must happen before service resumes.
“Before approving the next charging site, investors should ask how drivers will be served if it becomes unavailable, and how operations can be restored safely. Those answers belong in the investment case,” Cecchi said.
As more Thai drivers depend on electricity for everyday journeys, charging confidence will be earned through dependable access. Building climate resilience into today’s investment decisions gives Thailand a stronger foundation for the next stage of EV growth.
For media inquiries, please contact:
Weber Shandwick Thailand
Ms. Rungnapa Chanwisate (Rung)
Tel: +66 81 494 8131
Email: rungnapa@webershandwick.co.th